Project Scope
Project scope included:
- Full depth asphalt pavement reconstruction and widening
- Pavement resurfacing
- Storm sewer
- Detention basins
- Curb and gutter
- Traffic signal modernization
- Landscaping
The existing 143rd Street two lane pavement was removed and replaced with a bituminous pavement to provide a four lane roadway with left turn lanes.
Several areas of subgrade exhibiting poor soil conditions needed to be undercut and filled with porous granular embankment to provide a stable road bed.
The existing Will-Cook Road pavement was milled to various depths to provide a smoother profile and resurfaced with 2” of bituminous surface course.
Awards:
- 2015 ACEC Engineering Excellence Merit Award
- 2015 APWA Southwest Branch Transportation Project of the Year Award